Lion Hill

The windfarm is located in South Lanarkshire approximately 7km south east of Elvanfoot in the Daer Valley, close to the Daer Reservoir. The turbines will be sited adjacent to the operational Clyde Windfarm on agricultural land currently used for rough grazing.

Further information about this development can be found in the project information table opposite:

Project Information Table:

No.of Turbines
4
Total Capacity
9.2 MW
Tip Height
126.5m
Date Submitted to
South Lanarkshire Council
June 2013
Status
In Pre-Construction
Consented January 2016